swarmheart/leviathan-write-projection #26

Closed
opened 2026-05-09 23:27:03 +02:00 by codex · 1 comment
Collaborator

Parent: #2
Wave: 5 - Swarmheart / Leviathan
Depends on: #24, #25, #4, #15

Summary

Add controlled Leviathan writes through the Kan-ductor Integration API with audit and drift awareness.

Scope

  • Apply approved projection changes to Kan-ductor through narrow Integration API tools.
  • Use machine identity and scoped credential model.
  • Write audit events for every create/move/comment/projection action.
  • Respect drift: flag and require decision instead of silently overwriting manual Kan moves.

Non-goals

  • No bulk mutation without dry-run preview.
  • No delete/archive by default.
  • No autonomous correction of Piotr's board.
  • No making Kan-ductor the Swarmheart source of truth.

Acceptance Criteria

  • Projection writes are idempotent.
  • Every mutation returns auditPublicId and links to source projection input.
  • Drift blocks or flags unsafe writes according to contract.
  • Rollback path for last projection batch is documented.

Tests / Smoke

  • E2E projection smoke on non-production board.
  • Idempotency replay test.
  • Audit completeness test.
  • Manual production write smoke only after explicit owner approval.

Rollback

Disable write projection and revert affected projection batch using recorded audit/idempotency data where safe.

Owner Gates

Hard stop before production writes, credential issuance, deploy/restart, or trust-boundary changes.

Parent: #2 Wave: 5 - Swarmheart / Leviathan Depends on: #24, #25, #4, #15 ## Summary Add controlled Leviathan writes through the Kan-ductor Integration API with audit and drift awareness. ## Scope - Apply approved projection changes to Kan-ductor through narrow Integration API tools. - Use machine identity and scoped credential model. - Write audit events for every create/move/comment/projection action. - Respect drift: flag and require decision instead of silently overwriting manual Kan moves. ## Non-goals - No bulk mutation without dry-run preview. - No delete/archive by default. - No autonomous correction of Piotr's board. - No making Kan-ductor the Swarmheart source of truth. ## Acceptance Criteria - Projection writes are idempotent. - Every mutation returns auditPublicId and links to source projection input. - Drift blocks or flags unsafe writes according to contract. - Rollback path for last projection batch is documented. ## Tests / Smoke - E2E projection smoke on non-production board. - Idempotency replay test. - Audit completeness test. - Manual production write smoke only after explicit owner approval. ## Rollback Disable write projection and revert affected projection batch using recorded audit/idempotency data where safe. ## Owner Gates Hard stop before production writes, credential issuance, deploy/restart, or trust-boundary changes.
Owner

Resolved by PR #50 (feat: add controlled leviathan projection apply), landed on main via chain drain PR #52 (2026-05-10).

⚠️ Follow-up p0 (security/scope hard blocker): 3+3 review flagged that real apply reuses generic cards:create/cards:move scopes and lacks dedicated projection write authority/feature gate. Plus: secret/gate warnings do not block writes, weak drift classifier dependency, partial batch failure recovery, maxTasks check happens after preview construction. Tracked separately as p0 follow-up issues.

Closing this acceptance issue. Security hardening tracked elsewhere.

— Prof Opus 🦍🎓 (war-room cleanup)

Resolved by **PR #50** (`feat: add controlled leviathan projection apply`), landed on main via chain drain PR #52 (2026-05-10). ⚠️ **Follow-up p0** (security/scope hard blocker): 3+3 review flagged that real apply reuses generic `cards:create`/`cards:move` scopes and lacks dedicated projection write authority/feature gate. Plus: secret/gate warnings do not block writes, weak drift classifier dependency, partial batch failure recovery, maxTasks check happens after preview construction. Tracked separately as p0 follow-up issues. Closing this acceptance issue. Security hardening tracked elsewhere. — Prof Opus 🦍🎓 (war-room cleanup)
Sign in to join this conversation.
No labels
3plus3-followup
agent/claude-code
agent/codex
agent/hermes
agent/iskra
agent/ollama
agent/patchwarden
analytics
api
cockpit
dependency/blocked
dependency/blocks-others
dependency/cross-repo
dependency/needs-confirmation
docs
domain:agents
domain:ci
domain:docs
domain:forgejo
domain:infra
domain:memory
domain:runtime
domain:signal
domain:ux
flow/architecture
flow/blocked
flow/deployed
flow/done
flow/implementation
flow/intake
flow/maintained
flow/observed
flow/ready
flow/refining
flow/retired
flow/review
gemini-flash
judge/codex-candidate
judge/hermes-candidate
judge/low-confidence
judge/needs-refinement
judge/operator-needed
judge/p0
judge/p1
judge/p2
judge/p3
judge/park
judge/patchwarden-candidate
judge/stale-priority
kind/adr
kind/bug
kind/chore
kind/feature
kind/infra
kind/ops
kind/refactor
kind/research
leviathan
mcp
merge/auto
merge/manual
merge/manual-dependency-conflict
merge/manual-failing-tests
merge/manual-merge-conflict
merge/manual-missing-review
merge/manual-operator-preference
merge/manual-red-zone
merge/manual-security-sensitive
merge/manual-unclear-scope
merge/manual-unknown
mode:operator-only
mode:patchwarden-iskra-approved
mode:safe-auto
observed/erroring
observed/needs-followup
observed/pending
observed/retire-candidate
observed/unused
observed/used
ops
priority:p0
priority:p1
priority:p2
priority:p3
review:claude-reviewed
review:codex-reviewed
review:dziadek-reviewed
review:needs-human
safety
safety:external-write
safety:no-prod-mutation
safety:prod-impact
safety:secret-touch
scout
security
size/large
size/medium
size/small
size/tiny
size/unknown
small-task
source/adr
source/agent-generated
source/manual
source/operator-chat
source/voice-note
status:blocked
status:codex-ready
status:merged:pending-evidence
status:needs-evidence
status:operator-needed
status:parked
tests
tier:0-platform-substrate
tier:1-iskra-value-layer
tier:2-tools-products-modules
type:bug
type:chore
type:docs
type:feat
type:policy
type:research
ui
No milestone
No project
No assignees
2 participants
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
pdurlej/kan-ductor#26
No description provided.