ops: ADR-0014 Phase 06 prune Q2-2026 additional sunset candidates + silverbullet migration spec #173
No reviewers
Labels
No labels
W6d-automerge-calibration
agent/claude-code
agent/codex
agent/hermes
agent/iskra
agent/ollama
agent/patchwarden
automerge-candidate
class/security-sensitive
cutover-gate
dependency/blocked
dependency/blocks-others
dependency/cross-repo
dependency/needs-confirmation
domain:agents
domain:ci
domain:docs
domain:forgejo
domain:infra
domain:memory
domain:runtime
domain:signal
domain:ux
flow/architecture
flow/blocked
flow/deployed
flow/done
flow/implementation
flow/intake
flow/maintained
flow/observed
flow/ready
flow/refining
flow/retired
flow/review
iterating
judge/codex-candidate
judge/hermes-candidate
judge/low-confidence
judge/needs-refinement
judge/operator-needed
judge/p0
judge/p1
judge/p2
judge/p3
judge/park
judge/patchwarden-candidate
judge/stale-priority
kind/adr
kind/bug
kind/chore
kind/feature
kind/infra
kind/ops
kind/refactor
kind/research
large-impact
merge/auto
merge/manual
merge/manual-dependency-conflict
merge/manual-failing-tests
merge/manual-merge-conflict
merge/manual-missing-review
merge/manual-operator-preference
merge/manual-red-zone
merge/manual-security-sensitive
merge/manual-unclear-scope
merge/manual-unknown
meta
mode:operator-only
mode:patchwarden-iskra-approved
mode:safe-auto
needs-operator-decision
needs-triage
not-ready
observed/erroring
observed/needs-followup
observed/pending
observed/retire-candidate
observed/unused
observed/used
operator-emotional
owner-attention
phase/02
phase/03
priority:p0
priority:p1
priority:p2
priority:p3
proposed
ready-for-agent
ready-for-operator
recovery
review:claude-reviewed
review:codex-reviewed
review:dziadek-reviewed
review:needs-human
risk/exposure
risk/process
risk/product
risk/runtime
safety:external-write
safety:no-prod-mutation
safety:prod-impact
safety:secret-touch
size/large
size/medium
size/small
size/tiny
size/unknown
source/adr
source/agent-generated
source/manual
source/operator-chat
source/voice-note
status:blocked
status:codex-ready
status:merged:pending-evidence
status:needs-evidence
status:operator-needed
status:parked
tier/full
tier/lite
tier/stacked
tier:0-platform-substrate
tier:1-iskra-value-layer
tier:2-tools-products-modules
type:bug
type:chore
type:docs
type:feat
type:policy
type:research
No milestone
No project
No assignees
2 participants
Notifications
Due date
No due date set.
Dependencies
No dependencies set.
Reference
pdurlej/platform!173
Loading…
Add table
Add a link
Reference in a new issue
No description provided.
Delete branch "claude-orchestrator/sunset-triage-q2-2026"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
What
Per GPT-5.5 Pro oracle review §6 OVER-ENGINEERING audit: adds 3 new sunset candidates to the Q2-2026 cohort + ships migration spec for the already-scheduled silverbullet sunset (deadline 2026-05-30, 19 days from now).
Recommendations only, not actions. Operator decides per-module via follow-up PRs after reviewing proposals.
Files (5)
decisions/0014-prune-q2-2026-additional-candidates.mddocs/sunset-proposals/np-openhabittracker.mddocs/sunset-proposals/shelfmark.mddocs/sunset-proposals/np-tududi.mddocs/sunset-proposals/silverbullet-migration.mdSunset cohort Q2-2026 (this PR adds)
np-openhabittrackershelfmarknp-tududiSilverbullet migration table (canonical, per ADR §Migration table)
pdurlej/platformrepo (docs/runbooks/)02 Areas/,03 Resources/)home-platform-np-memos-105 System/templates/00 Inbox/drafts/Operator runs ~2-hour focus block before 2026-05-30 deadline.
NOT in this cohort (preserved with rationale)
What this PR DOES NOT do
module.yaml(operator decides per-module via follow-up PRs)Acceptance criteria
risk/process(touchesdecisions/).Rollback
Pure additive (5 new files, 0 modified). Reverting deletes the proposals.
Refs
Codex effort needed
Review + merge. No runtime change. After merge: operator decides per-module + executes silverbullet migration within deadline window.
Role: orchestrator / drafter (claude)
Lane: Phase 06 prep
Next: operator reviews 4 proposals → 3 module-amendment PRs (per-module sunset/park decisions) → silverbullet 2-hour migration pass.
Per GPT-5.5 Pro oracle review §6 OVER-ENGINEERING audit, adds 3 new sunset candidates to the Q2-2026 review cohort + ships migration spec for the already-scheduled silverbullet sunset (deadline 2026-05-30, 19 days from now). Additional candidates (ADR-0014 §Sunset candidates Q2-2026) - np-openhabittracker: SUNSET unless weekly active use - shelfmark: PARK then SUNSET unless integrates with research workflow - np-tududi: 3-option operator decision (consolidate to Kan / keep both with documented separation / sunset to Obsidian-Iskra) Per-module sunset proposals (docs/sunset-proposals/) - np-openhabittracker.md: rationale + Obsidian daily-note replacement + export procedure + risk matrix - shelfmark.md: 2-phase migration (park first; sunset at deadline) + risk matrix - np-tududi.md: 3 options (A consolidate / B keep both / C sunset to Obsidian) with pros/cons each - silverbullet-migration.md: per-content-type migration table covering operational docs / personal notes / scratch memos / tasks / decisions / templates / drafts; operator workflow recommendation (single 2-hour pass) NOT in this cohort (preserved with rationale) - np-meerkat-{backend,frontend} (CRM): serves operator's contacts; separate ADR before sunset - np-radicale (CalDAV): serves operator's calendar; separate ADR - searxng: actively used by Hermes for research; stays - voice-transcription: actively used; stays - gmail-openclaw-broker / gmail-triage-mcp: Iskra mail integration; stays What this PR DOES NOT do - Does NOT modify any module.yaml (operator decides per-module via follow-up PRs after reviewing proposals) - Does NOT execute any migration or decommission - Does NOT delete any container, manifest, or module directory - Does NOT touch silverbullet (existing 2026-05-30 sunset retained; this PR adds the migration spec only) Refs - GPT-5.5 Pro oracle review 2026-05-11 §6 OVER-ENGINEERING audit (additional sunset candidates) + recommendation to migrate silverbullet by content type - INDEX.md (2026-04-30) existing sunset queue: silverbullet, vault, audio-mcp-legacy, signal-bridge-legacy, products-agent-eval-lab, teamspeak3 - PLATFORM_CHARTER.md §6 (Definition of Sunset) **Role:** orchestrator / drafter (claude)Fork A triage (codex): closing as superseded by the current post-soak cleanup model.
This old Phase 06 prune/sunset ADR predates ADR-0020 and the current milestone roadmap. Cleanup and sunset work now belongs to Milestone 01 (legacy cleanup) and later module-upgrade/sunset waves, with ADR-0020 gates.
The per-module sunset notes may still be useful raw material, but this PR should not be merged as a Phase 06 ADR in the post-cutoff roadmap.
Pull request closed