DRAFT: docs(prompts): stage F2 post-260 soak ramp #287
No reviewers
Labels
No labels
W6d-automerge-calibration
agent/claude-code
agent/codex
agent/hermes
agent/iskra
agent/ollama
agent/patchwarden
automerge-candidate
class/security-sensitive
cutover-gate
dependency/blocked
dependency/blocks-others
dependency/cross-repo
dependency/needs-confirmation
domain:agents
domain:ci
domain:docs
domain:forgejo
domain:infra
domain:memory
domain:runtime
domain:signal
domain:ux
flow/architecture
flow/blocked
flow/deployed
flow/done
flow/implementation
flow/intake
flow/maintained
flow/observed
flow/ready
flow/refining
flow/retired
flow/review
iterating
judge/codex-candidate
judge/hermes-candidate
judge/low-confidence
judge/needs-refinement
judge/operator-needed
judge/p0
judge/p1
judge/p2
judge/p3
judge/park
judge/patchwarden-candidate
judge/stale-priority
kind/adr
kind/bug
kind/chore
kind/feature
kind/infra
kind/ops
kind/refactor
kind/research
large-impact
merge/auto
merge/manual
merge/manual-dependency-conflict
merge/manual-failing-tests
merge/manual-merge-conflict
merge/manual-missing-review
merge/manual-operator-preference
merge/manual-red-zone
merge/manual-security-sensitive
merge/manual-unclear-scope
merge/manual-unknown
meta
mode:operator-only
mode:patchwarden-iskra-approved
mode:safe-auto
needs-operator-decision
needs-triage
not-ready
observed/erroring
observed/needs-followup
observed/pending
observed/retire-candidate
observed/unused
observed/used
operator-emotional
owner-attention
phase/02
phase/03
priority:p0
priority:p1
priority:p2
priority:p3
proposed
ready-for-agent
ready-for-operator
recovery
review:claude-reviewed
review:codex-reviewed
review:dziadek-reviewed
review:needs-human
risk/exposure
risk/process
risk/product
risk/runtime
safety:external-write
safety:no-prod-mutation
safety:prod-impact
safety:secret-touch
size/large
size/medium
size/small
size/tiny
size/unknown
source/adr
source/agent-generated
source/manual
source/operator-chat
source/voice-note
status:blocked
status:codex-ready
status:merged:pending-evidence
status:needs-evidence
status:operator-needed
status:parked
tier/full
tier/lite
tier/stacked
tier:0-platform-substrate
tier:1-iskra-value-layer
tier:2-tools-products-modules
type:bug
type:chore
type:docs
type:feat
type:policy
type:research
No milestone
No project
No assignees
1 participant
Notifications
Due date
No due date set.
Dependencies
No dependencies set.
Reference
pdurlej/platform!287
Loading…
Add table
Add a link
Reference in a new issue
No description provided.
Delete branch "codex/f2/post-260-soak-dispatch"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Canary status: missing — fire canary 3+3 manually before merge
DRAFT — do not merge until #260 08:00 soak evidence is green.
Canary Context Pack
Product story
Tomorrow morning should not be another planning session. If #260 soak is clean, the operator should have a ready dispatch for the remaining immediate F2 stateless no-op smokes.
What changed
Adds
prompts/codex-f2-post-260-soak-ramp-2026-05-16.md, a tightened F2 dispatch that starts with #260 soak evidence, then runs the remaining stateless candidates one at a time.Why it changed
The old F2 prompt assumed #260 was still an observation lane. After the deploy-runner scope fix, the next F2 ramp should treat watchdog restarts as a stop signal, not expected diagnostic noise.
Files touched
prompts/codex-f2-post-260-soak-ramp-2026-05-16.mdRelevant context
prompts/codex-f2-ramp-continuation-2026-05-14.md.Runtime evidence
No runtime mutation in this PR. The prompt references already collected post-fix evidence: #957 and #958 picked up without watchdog restart.
Known constraints
Explicit out-of-scope
Requested decision
Keep as a draft until the #260 soak is green, then merge/use as the morning F2 execution packet.
Merge blockers
task_id=0for minutes.Spec sources read
prompts/codex-f2-ramp-continuation-2026-05-14.md— prior F2 dispatch.decisions/0018-agentic-first-fix-root-causes.md— no recurring false-fire framing.docs/ci/runner-contract.md— deploy runner contract after #286.Test plan
Fork D triage — closing superseded
Role: executor
Decision: close, no rewrite.
This PR is a historical F2 post-#260 dispatch for 2026-05-16. The F2/F3/cutoff work it prepared has already been completed and the active planning surface is now the milestone roadmap / current status, not this dated prompt. Keeping this open would invite a future agent to replay an obsolete migration instruction.
No production mutation performed. Closing as superseded.
Pull request closed