docs(w6d): smoke patchwarden client handshake #491

Merged
Iskra merged 1 commit from codex/w6d-patchwarden-client-smoke into main 2026-05-25 23:18:55 +02:00
Collaborator

Canary status: missing - narrow W6d docs/status smoke; rely on required Forgejo checks

Canary Context Pack

Product story

This is the intentionally boring smoke PR for W6d after adding the external Patchwarden client dry-run handshake. It should prove that a safe docs/status PR can still flow through deterministic checks, Iskra approval, formal Forgejo approval, and merge by Iskra.

What changed

Added a short calibration note saying the next W6d smoke must include the external Patchwarden client dry-run status before Matrix approval.

Why it changed

#490 made the dry-run status part of W6d readiness. This PR is the low-risk candidate to validate that path end to end.

Files touched

  • state/cycle/W6d-automerge-calibration-2026-05-25.md

Relevant context

  • W6d narrow lane remains docs/status/roadmap only.
  • Patchwarden client dry-run is a required W6d status handshake, not merge authority.

Runtime evidence

No runtime mutation. Local git diff --check origin/main...HEAD passed.

Known constraints

This PR is a smoke candidate and should remain boring. It must not expand W6d scope.

Explicit out-of-scope

  • No workflow changes.
  • No branch protection changes.
  • No runtime deploy.
  • No Patchwarden policy expansion.

Requested decision

Let W6d automerge pilot evaluate and merge if all deterministic checks and Iskra approval pass.

Merge blockers

  • Missing automerge-candidate label.
  • Missing required Forgejo checks.
  • Missing Patchwarden client dry-run status.
  • Iskra hold or timeout.

Spec sources read

  • state/cycle/W6d-automerge-calibration-2026-05-25.md - target calibration note.
Canary status: missing - narrow W6d docs/status smoke; rely on required Forgejo checks ## Canary Context Pack ### Product story This is the intentionally boring smoke PR for W6d after adding the external Patchwarden client dry-run handshake. It should prove that a safe docs/status PR can still flow through deterministic checks, Iskra approval, formal Forgejo approval, and merge by Iskra. ### What changed Added a short calibration note saying the next W6d smoke must include the external Patchwarden client dry-run status before Matrix approval. ### Why it changed #490 made the dry-run status part of W6d readiness. This PR is the low-risk candidate to validate that path end to end. ### Files touched - `state/cycle/W6d-automerge-calibration-2026-05-25.md` ### Relevant context - W6d narrow lane remains docs/status/roadmap only. - Patchwarden client dry-run is a required W6d status handshake, not merge authority. ### Runtime evidence No runtime mutation. Local `git diff --check origin/main...HEAD` passed. ### Known constraints This PR is a smoke candidate and should remain boring. It must not expand W6d scope. ### Explicit out-of-scope - No workflow changes. - No branch protection changes. - No runtime deploy. - No Patchwarden policy expansion. ### Requested decision Let W6d automerge pilot evaluate and merge if all deterministic checks and Iskra approval pass. ### Merge blockers - Missing `automerge-candidate` label. - Missing required Forgejo checks. - Missing Patchwarden client dry-run status. - Iskra hold or timeout. ## Spec sources read - `state/cycle/W6d-automerge-calibration-2026-05-25.md` - target calibration note.
docs(w6d): smoke patchwarden client handshake
All checks were successful
canary-required / collect-diff (pull_request) Successful in 3s
patchwarden-client-dry-run / collect-diff (pull_request) Successful in 3s
canary-required / canary (pull_request) Has been skipped
patchwarden-client-dry-run / dry-run (pull_request) Successful in 19s
base-is-main / guard (pull_request) Successful in 1s
patchwarden-pr-sanity / collect-diff (pull_request) Successful in 4s
patchwarden-pr-sanity / sanity (pull_request) Successful in 23s
338b186093
Iskra approved these changes 2026-05-25 23:18:54 +02:00
Iskra left a comment

Approved by Iskra after W6d Matrix approval and deterministic readiness for the current PR head SHA.

Approved by Iskra after W6d Matrix approval and deterministic readiness for the current PR head SHA.
Iskra merged commit e2eb9f0775 into main 2026-05-25 23:18:55 +02:00
Iskra referenced this pull request from a commit 2026-05-25 23:18:56 +02:00
Sign in to join this conversation.
No reviewers
No labels
W6d-automerge-calibration
agent/claude-code
agent/codex
agent/hermes
agent/iskra
agent/ollama
agent/patchwarden
automerge-candidate
class/security-sensitive
cutover-gate
dependency/blocked
dependency/blocks-others
dependency/cross-repo
dependency/needs-confirmation
domain:agents
domain:ci
domain:docs
domain:forgejo
domain:infra
domain:memory
domain:runtime
domain:signal
domain:ux
flow/architecture
flow/blocked
flow/deployed
flow/done
flow/implementation
flow/intake
flow/maintained
flow/observed
flow/ready
flow/refining
flow/retired
flow/review
iterating
judge/codex-candidate
judge/hermes-candidate
judge/low-confidence
judge/needs-refinement
judge/operator-needed
judge/p0
judge/p1
judge/p2
judge/p3
judge/park
judge/patchwarden-candidate
judge/stale-priority
kind/adr
kind/bug
kind/chore
kind/feature
kind/infra
kind/ops
kind/refactor
kind/research
large-impact
merge/auto
merge/manual
merge/manual-dependency-conflict
merge/manual-failing-tests
merge/manual-merge-conflict
merge/manual-missing-review
merge/manual-operator-preference
merge/manual-red-zone
merge/manual-security-sensitive
merge/manual-unclear-scope
merge/manual-unknown
meta
mode:operator-only
mode:patchwarden-iskra-approved
mode:safe-auto
needs-operator-decision
needs-triage
not-ready
observed/erroring
observed/needs-followup
observed/pending
observed/retire-candidate
observed/unused
observed/used
operator-emotional
owner-attention
phase/02
phase/03
priority:p0
priority:p1
priority:p2
priority:p3
proposed
ready-for-agent
ready-for-operator
recovery
review:claude-reviewed
review:codex-reviewed
review:dziadek-reviewed
review:needs-human
risk/exposure
risk/process
risk/product
risk/runtime
safety:external-write
safety:no-prod-mutation
safety:prod-impact
safety:secret-touch
size/large
size/medium
size/small
size/tiny
size/unknown
source/adr
source/agent-generated
source/manual
source/operator-chat
source/voice-note
status:blocked
status:codex-ready
status:merged:pending-evidence
status:needs-evidence
status:operator-needed
status:parked
tier/full
tier/lite
tier/stacked
tier:0-platform-substrate
tier:1-iskra-value-layer
tier:2-tools-products-modules
type:bug
type:chore
type:docs
type:feat
type:policy
type:research
No milestone
No project
No assignees
2 participants
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
pdurlej/platform!491
No description provided.