docs(decisions): D28 closed-loop controller + dependency-offloading; self-usable milestone #158
No reviewers
Labels
No labels
agent/claude-code
agent/codex
agent/gemini
agent/hermes
agent/iskra
agent/ollama
agent/patchwarden
area:business-model
area:competitive
area:discovery
area:forgejo
area:metrics
area:product-strategy
area:v0-core
cagan-grade-approved
client:platform
dependency/blocked
dependency/blocks-others
dependency/cross-repo
dependency/needs-confirmation
domain:agents
domain:ci
domain:docs
domain:forgejo
domain:infra
domain:memory
domain:runtime
domain:signal
domain:ux
flow/architecture
flow/blocked
flow/deployed
flow/done
flow/implementation
flow/intake
flow/maintained
flow/observed
flow/ready
flow/refining
flow/retired
flow/review
judge/codex-candidate
judge/hermes-candidate
judge/low-confidence
judge/needs-refinement
judge/operator-needed
judge/p0
judge/p1
judge/p2
judge/p3
judge/park
judge/patchwarden-candidate
judge/stale-priority
kind/adr
kind/bug
kind/chore
kind/feature
kind/infra
kind/ops
kind/refactor
kind/research
kind:artifact
kind:decision
kind:dogfood
kind:epic
kind:implementation
kind:research
merge/auto
merge/manual
merge/manual-dependency-conflict
merge/manual-failing-tests
merge/manual-merge-conflict
merge/manual-missing-review
merge/manual-operator-preference
merge/manual-red-zone
merge/manual-security-sensitive
merge/manual-unclear-scope
merge/manual-unknown
mode:operator-only
mode:patchwarden-iskra-approved
mode:safe-auto
observed/erroring
observed/needs-followup
observed/pending
observed/retire-candidate
observed/unused
observed/used
priority:p0
priority:p1
priority:p2
priority:p3
ready-for-agent
review:claude-reviewed
review:codex-reviewed
review:dziadek-reviewed
review:needs-human
safety:external-write
safety:no-prod-mutation
safety:prod-impact
safety:secret-touch
size/large
size/medium
size/small
size/tiny
size/unknown
source/adr
source/agent-generated
source/manual
source/operator-chat
source/voice-note
status:blocked
status:blocked-on-discovery
status:cagan-grade-review-pending
status:codex-ready
status:merged:pending-evidence
status:needs-evidence
status:needs-operator-decision
status:operator-needed
status:parked
tier:0-anchor
tier:0-platform-substrate
tier:1-core
tier:1-iskra-value-layer
tier:2-supporting
tier:2-tools-products-modules
type:bug
type:chore
type:docs
type:feat
type:policy
type:research
wave:1-foundation
wave:2-positioning
wave:3-validation
wave:4-economics
wave:5-operating
No milestone
No project
No assignees
1 participant
Notifications
Due date
No due date set.
Dependencies
No dependencies set.
Reference
pdurlej/patchwarden!158
Loading…
Add table
Add a link
Reference in a new issue
No description provided.
Delete branch "claude/decisions-d28-closed-loop"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Summary
Records the 2026-06-23 operator/Codex strategy as D28 and makes D27's "self-usable" trigger concrete.
D28 — gate → closed-loop trust controller. Patchwarden stops asking only "may this PR merge?" and adds "was my last decision good?", calibrating from the answer. Built as three loops:
post_merge_feedback.v1, #147/#156),repair_instruction.v1— to build; filed alongside this PR).Plus the dependency-offloading principle + hard boundary: lean on external tools (Sandcastle, Steel, a future Opik) for execution, but retain the verdict — stdlib core re-evaluates evidence fail-closed/head-bound/sanitized; producer-unavailable →
blocked; L3 repair is policy-derived not model-authored; analytics→trust stays operator-gated (#134).self-usable-milestone.md turns D27's vague trigger into a capability checklist: 3 loops closed + merge frontier crossed safely on
platform/openclaw. That checklist is now both the discovery trigger (D27) and the build north star.Changes
docs/decisions.md— D28 section + summary-table row 28.docs/product/self-usable-milestone.md(new) — operational definition + checklist mapping to the 3 loops, the merge frontier, and PW-G rows.docs/STATUS.md— wedge line + entry points point to the milestone; decision-log range → D1–D28.Does NOT change
Verification
unittest discover -s tests— 656 green;git diff --checkclean; disjoint files.Authored by claude per the operator green-light ("D28 + issue L3 + self-usable milestone → rób").
D28 reframes Patchwarden from a one-shot pre-merge gate to a closed-loop trust controller ("may I merge?" + "was my last decision good?") via three loops (L1 pre-merge e2e/sandbox, L2 post-merge analytics, L3 agent feedback/ repair), plus the dependency-offloading principle with its hard boundary (offload execution, retain verdict; producer-unavailable -> fail-closed; L3 repair policy-derived not model-authored; analytics->trust operator-gated). Runs entirely inside the D20/D24/D26 floor. self-usable-milestone.md makes D27's discovery trigger concrete: the capability checklist for the unattended autonomous merge loop on the operator's own repos = 3 loops closed + merge frontier crossed safely. - decisions.md: D28 section + summary-table row 28 - docs/product/self-usable-milestone.md (new): the operational definition - STATUS.md: wedge line + entry points point to the milestone; D1-D28