docs(w6d): record automerge calibration posture #480

Merged
Iskra merged 1 commit from codex/w6d-calibration-pilot-lessons into main 2026-05-25 11:37:02 +02:00
Collaborator

Canary status: missing — not required for docs/status-only W6d calibration PR

Canary Context Pack

Product story

W6d is now capable of merging narrow docs/status PRs through deterministic checks, Platform Approvals Matrix, Iskra approval, and a formal Forgejo review. The next useful step is calibration: many tiny, boring PRs that prove the path is reliable before widening scope.

What changed

Updated the W6d pilot note to record the proven e2e runs and define calibration as the current next step.

Why it changed

The previous note still described the lane as pre-merge-actor. That is outdated after the successful Iskra-merged proof PRs.

Files touched

  • state/cycle/W6d-autonomous-merge-pilot.md

Relevant context

  • PR #476: first complete W6d e2e proof
  • PR #479: first W6d calibration PR

Runtime evidence

None. Docs/status-only calibration record.

Known constraints

This PR does not expand automerge scope.

Explicit out-of-scope

No runtime, secret, workflow, branch protection, ADR, module, schema, or control-plane changes.

Requested decision

Automerge through W6d if deterministic readiness, Iskra approval, and required Forgejo checks pass.

Merge blockers

Any W6d readiness blocker, failed required check, stale branch, or Iskra hold.

Spec sources read

  • state/cycle/W6d-autonomous-merge-pilot.md — target pilot note

Tests

  • git diff --check
Canary status: missing — not required for docs/status-only W6d calibration PR ## Canary Context Pack ### Product story W6d is now capable of merging narrow docs/status PRs through deterministic checks, Platform Approvals Matrix, Iskra approval, and a formal Forgejo review. The next useful step is calibration: many tiny, boring PRs that prove the path is reliable before widening scope. ### What changed Updated the W6d pilot note to record the proven e2e runs and define calibration as the current next step. ### Why it changed The previous note still described the lane as pre-merge-actor. That is outdated after the successful Iskra-merged proof PRs. ### Files touched - `state/cycle/W6d-autonomous-merge-pilot.md` ### Relevant context - PR #476: first complete W6d e2e proof - PR #479: first W6d calibration PR ### Runtime evidence None. Docs/status-only calibration record. ### Known constraints This PR does not expand automerge scope. ### Explicit out-of-scope No runtime, secret, workflow, branch protection, ADR, module, schema, or control-plane changes. ### Requested decision Automerge through W6d if deterministic readiness, Iskra approval, and required Forgejo checks pass. ### Merge blockers Any W6d readiness blocker, failed required check, stale branch, or Iskra hold. ## Spec sources read - `state/cycle/W6d-autonomous-merge-pilot.md` — target pilot note ## Tests - `git diff --check`
docs(w6d): record automerge calibration posture
All checks were successful
canary-required / collect-diff (pull_request) Successful in 4s
base-is-main / guard (pull_request) Successful in 1s
patchwarden-pr-sanity / collect-diff (pull_request) Successful in 4s
canary-required / canary (pull_request) Has been skipped
patchwarden-pr-sanity / sanity (pull_request) Successful in 24s
eb747d4002
Iskra approved these changes 2026-05-25 11:37:01 +02:00
Iskra left a comment

Approved by Iskra after W6d Matrix approval and deterministic readiness for the current PR head SHA.

Approved by Iskra after W6d Matrix approval and deterministic readiness for the current PR head SHA.
Iskra merged commit 49535ad191 into main 2026-05-25 11:37:02 +02:00
Iskra referenced this pull request from a commit 2026-05-25 11:37:03 +02:00
Sign in to join this conversation.
No reviewers
No labels
W6d-automerge-calibration
agent/claude-code
agent/codex
agent/hermes
agent/iskra
agent/ollama
agent/patchwarden
automerge-candidate
class/security-sensitive
cutover-gate
dependency/blocked
dependency/blocks-others
dependency/cross-repo
dependency/needs-confirmation
domain:agents
domain:ci
domain:docs
domain:forgejo
domain:infra
domain:memory
domain:runtime
domain:signal
domain:ux
flow/architecture
flow/blocked
flow/deployed
flow/done
flow/implementation
flow/intake
flow/maintained
flow/observed
flow/ready
flow/refining
flow/retired
flow/review
iterating
judge/codex-candidate
judge/hermes-candidate
judge/low-confidence
judge/needs-refinement
judge/operator-needed
judge/p0
judge/p1
judge/p2
judge/p3
judge/park
judge/patchwarden-candidate
judge/stale-priority
kind/adr
kind/bug
kind/chore
kind/feature
kind/infra
kind/ops
kind/refactor
kind/research
large-impact
merge/auto
merge/manual
merge/manual-dependency-conflict
merge/manual-failing-tests
merge/manual-merge-conflict
merge/manual-missing-review
merge/manual-operator-preference
merge/manual-red-zone
merge/manual-security-sensitive
merge/manual-unclear-scope
merge/manual-unknown
meta
mode:operator-only
mode:patchwarden-iskra-approved
mode:safe-auto
needs-operator-decision
needs-triage
not-ready
observed/erroring
observed/needs-followup
observed/pending
observed/retire-candidate
observed/unused
observed/used
operator-emotional
owner-attention
phase/02
phase/03
priority:p0
priority:p1
priority:p2
priority:p3
proposed
ready-for-agent
ready-for-operator
recovery
review:claude-reviewed
review:codex-reviewed
review:dziadek-reviewed
review:needs-human
risk/exposure
risk/process
risk/product
risk/runtime
safety:external-write
safety:no-prod-mutation
safety:prod-impact
safety:secret-touch
size/large
size/medium
size/small
size/tiny
size/unknown
source/adr
source/agent-generated
source/manual
source/operator-chat
source/voice-note
status:blocked
status:codex-ready
status:merged:pending-evidence
status:needs-evidence
status:operator-needed
status:parked
tier/full
tier/lite
tier/stacked
tier:0-platform-substrate
tier:1-iskra-value-layer
tier:2-tools-products-modules
type:bug
type:chore
type:docs
type:feat
type:policy
type:research
No milestone
No project
No assignees
2 participants
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
pdurlej/platform!480
No description provided.