docs(v0): reflect M1 close progress in product README (TL;DR + Definition of done) #38

Merged
pdurlej merged 1 commit from claude/patchwarden-product-readme-m1-close-prep into main 2026-05-26 11:15:59 +02:00
Collaborator

Summary

Two surgical edits to docs/product/README.md that bring it in sync with reality on main and prepare epic #1 § Definition of done to close cleanly.

What changed

TL;DR section: replaces "contents pending (artifacts populate as waves execute)" (false since iter-1 batch landed) with current status — 12 artifacts drafted and merged, awaiting M1 operator close (due 2026-05-30). Adds reference to follow-up #35 for the post-M2 strategy v2.0 update.

Definition of done bullet 1: 11 → 12 artifact issues (iter-2 added strategic-thesis.md as #13). Names #10 close path explicitly per D16 lock + #35 follow-up so the epic-close path is reproducible after operator handoff.

Definition of done bullet 2: adds reference to cagan-grade-approved label (newly created — color 22c55e) — operator can flip or simply close.

Definition of done bullet 4: spells out the canonical answer to the one-sitting clarity test (from strategy.md Section 4 leadership-change test) so a successor PM can self-check without reading every artifact.

What did NOT change

  • All 12 per-Wave artifact entries already have correct links and "🟢 drafted, awaiting review" status — operator can flip per-row to "🟢 merged + approved" at close time (or in a follow-up PR after batch close)
  • Iteration log (iter 1 → iter 5), Cagan-grade quality bar, Operator decisions, Execution sequencing — all intact
  • No artifact files touched

Why now

Part of M1 close prep (operator request 2026-05-26). Pre-conditions for closing epic #1:

  1. All 12 artifact files merged to main (done since iter-2)
  2. cagan-grade-approved label created (this PR's sibling work, label id 121)
  3. Follow-up #35 created for post-M2 v2.0 update (this PR's sibling work)
  4. 🔄 This PR — README reflects reality so Definition of done bullet 3 is satisfied
  5. Operator quality-bar review of each artifact + close issues
  6. Operator passes one-sitting clarity test → close epic #1

Verification

  • head -20 docs/product/README.md shows new TL;DR
  • Definition of done section names #10 + #35 + canonical clarity-test answer
  • No per-artifact rows changed (Wave 1-5 + iter-2 tables intact)
  • git diff --stat shows only docs/product/README.md touched, +6/-4

🤖 claude (Patchwarden dedicated thread), as part of M1 close prep batch per operator decision. Sibling deliverables: label cagan-grade-approved (created), issue #35 (created), PR #34 (merged — roadmap restructure).

## Summary Two surgical edits to `docs/product/README.md` that bring it in sync with reality on `main` and prepare epic #1 § Definition of done to close cleanly. ## What changed **TL;DR section**: replaces *"contents pending (artifacts populate as waves execute)"* (false since iter-1 batch landed) with current status — 12 artifacts drafted and merged, awaiting M1 operator close (due 2026-05-30). Adds reference to follow-up #35 for the post-M2 strategy v2.0 update. **Definition of done bullet 1**: 11 → 12 artifact issues (iter-2 added strategic-thesis.md as #13). Names #10 close path explicitly per D16 lock + #35 follow-up so the epic-close path is reproducible after operator handoff. **Definition of done bullet 2**: adds reference to `cagan-grade-approved` label (newly created — color `22c55e`) — operator can flip or simply close. **Definition of done bullet 4**: spells out the canonical answer to the one-sitting clarity test (from `strategy.md` Section 4 leadership-change test) so a successor PM can self-check without reading every artifact. ## What did NOT change - All 12 per-Wave artifact entries already have correct links and "🟢 drafted, awaiting review" status — operator can flip per-row to "🟢 merged + approved" at close time (or in a follow-up PR after batch close) - Iteration log (iter 1 → iter 5), Cagan-grade quality bar, Operator decisions, Execution sequencing — all intact - No artifact files touched ## Why now Part of M1 close prep (operator request 2026-05-26). Pre-conditions for closing epic #1: 1. ✅ All 12 artifact files merged to `main` (done since iter-2) 2. ✅ `cagan-grade-approved` label created (this PR's sibling work, label id 121) 3. ✅ Follow-up #35 created for post-M2 v2.0 update (this PR's sibling work) 4. 🔄 This PR — README reflects reality so Definition of done bullet 3 is satisfied 5. ⏳ Operator quality-bar review of each artifact + close issues 6. ⏳ Operator passes one-sitting clarity test → close epic #1 ## Verification - [ ] `head -20 docs/product/README.md` shows new TL;DR - [ ] Definition of done section names #10 + #35 + canonical clarity-test answer - [ ] No per-artifact rows changed (Wave 1-5 + iter-2 tables intact) - [ ] `git diff --stat` shows only `docs/product/README.md` touched, +6/-4 --- 🤖 claude (Patchwarden dedicated thread), as part of M1 close prep batch per operator decision. Sibling deliverables: label `cagan-grade-approved` (created), issue #35 (created), PR #34 (merged — roadmap restructure).
Sign in to join this conversation.
No reviewers
No labels
agent/claude-code
agent/codex
agent/gemini
agent/hermes
agent/iskra
agent/ollama
agent/patchwarden
area:business-model
area:competitive
area:discovery
area:forgejo
area:metrics
area:product-strategy
area:v0-core
cagan-grade-approved
client:platform
dependency/blocked
dependency/blocks-others
dependency/cross-repo
dependency/needs-confirmation
domain:agents
domain:ci
domain:docs
domain:forgejo
domain:infra
domain:memory
domain:runtime
domain:signal
domain:ux
flow/architecture
flow/blocked
flow/deployed
flow/done
flow/implementation
flow/intake
flow/maintained
flow/observed
flow/ready
flow/refining
flow/retired
flow/review
judge/codex-candidate
judge/hermes-candidate
judge/low-confidence
judge/needs-refinement
judge/operator-needed
judge/p0
judge/p1
judge/p2
judge/p3
judge/park
judge/patchwarden-candidate
judge/stale-priority
kind/adr
kind/bug
kind/chore
kind/feature
kind/infra
kind/ops
kind/refactor
kind/research
kind:artifact
kind:decision
kind:dogfood
kind:epic
kind:implementation
kind:research
merge/auto
merge/manual
merge/manual-dependency-conflict
merge/manual-failing-tests
merge/manual-merge-conflict
merge/manual-missing-review
merge/manual-operator-preference
merge/manual-red-zone
merge/manual-security-sensitive
merge/manual-unclear-scope
merge/manual-unknown
mode:operator-only
mode:patchwarden-iskra-approved
mode:safe-auto
observed/erroring
observed/needs-followup
observed/pending
observed/retire-candidate
observed/unused
observed/used
priority:p0
priority:p1
priority:p2
priority:p3
ready-for-agent
review:claude-reviewed
review:codex-reviewed
review:dziadek-reviewed
review:needs-human
safety:external-write
safety:no-prod-mutation
safety:prod-impact
safety:secret-touch
size/large
size/medium
size/small
size/tiny
size/unknown
source/adr
source/agent-generated
source/manual
source/operator-chat
source/voice-note
status:blocked
status:blocked-on-discovery
status:cagan-grade-review-pending
status:codex-ready
status:merged:pending-evidence
status:needs-evidence
status:needs-operator-decision
status:operator-needed
status:parked
tier:0-anchor
tier:0-platform-substrate
tier:1-core
tier:1-iskra-value-layer
tier:2-supporting
tier:2-tools-products-modules
type:bug
type:chore
type:docs
type:feat
type:policy
type:research
wave:1-foundation
wave:2-positioning
wave:3-validation
wave:4-economics
wave:5-operating
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
pdurlej/patchwarden!38
No description provided.