docs(product): reframe L4 auto-heal as gate-live (operator-approved #7) + dated Bet 1 status #96

Merged
pdurlej merged 1 commit from claude/docs-product-spine-currency into main 2026-06-22 22:55:06 +02:00
Collaborator

What

Operator-approved (#7) narrative reframe: the product spine described L4 OpenClaw auto-heal as a 2027–2028 future, but the supervised auto-heal gate went live in production 2026-06-10 (Slice C, iskra-openclaw#452 — hourly timer, e2e-verified, D20 boundaries held).

Honest distinction kept throughout

The gate is live; the OSS-module extraction of L4 (D4) remains future, gated on the >5-PRs-without-false-blocker trigger. Every edit preserves that line — this is "gate arrived early," not "auto-heal done."

Edits

  • vision-narrative.md Turning Point 3: "Late 2028: auto-heal extracts" → "the supervised auto-heal gate arrives early (live 2026-06-10)"; full L4 extraction stays the 2028–2029 milestone.
  • strategy.md Bet 2: bet statement + evidence-backing header + the L4 bullet flip from assumption-pendingevidence-backed (gate); I7 notes the live gate as a concrete differentiator no incumbent ships.
  • strategy.md Bet 1: added a dated status — still 0 of 5–7 interviews, D15 install-count precondition unmet, deadline 2026-09-30 (D22) — flagged as the most critical bet-invalidating gap (it was nowhere surfaced before).
  • four-risks.md Feasibility: L4 gate de-risked early (live), Slice E + OSS extraction remain; split the old L3+L4/Q1–Q2-2027 estimate.

Safety

  • Docs-only; 303 tests green. No decision (D4) is rewritten — only the spine's currency.

From the 2026-06-16 docs-maturity wave (item #7). Do not merge — operator merge only.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>

## What Operator-approved (#7) narrative reframe: the product spine described L4 OpenClaw auto-heal as a 2027–2028 future, but the supervised auto-heal **gate** went live in production **2026-06-10** (Slice C, iskra-openclaw#452 — hourly timer, e2e-verified, D20 boundaries held). ## Honest distinction kept throughout The **gate** is live; the **OSS-module extraction** of L4 (D4) remains future, gated on the >5-PRs-without-false-blocker trigger. Every edit preserves that line — this is "gate arrived early," not "auto-heal done." ## Edits - **vision-narrative.md** Turning Point 3: "Late 2028: auto-heal extracts" → "the supervised auto-heal gate arrives early (live 2026-06-10)"; full L4 extraction stays the 2028–2029 milestone. - **strategy.md** Bet 2: bet statement + evidence-backing header + the L4 bullet flip from *assumption-pending* → *evidence-backed (gate)*; I7 notes the live gate as a concrete differentiator no incumbent ships. - **strategy.md** Bet 1: added a dated status — still **0 of 5–7** interviews, D15 install-count precondition unmet, deadline 2026-09-30 (D22) — flagged as the most critical bet-invalidating gap (it was nowhere surfaced before). - **four-risks.md** Feasibility: L4 gate de-risked early (live), Slice E + OSS extraction remain; split the old L3+L4/Q1–Q2-2027 estimate. ## Safety - Docs-only; **303 tests green**. No decision (D4) is rewritten — only the spine's currency. From the 2026-06-16 docs-maturity wave (item #7). **Do not merge — operator merge only.** Co-Authored-By: Claude Opus 4.8 (1M context) &lt;noreply@anthropic.com&gt;
docs(product): reframe L4 auto-heal as gate-live (operator-approved #7) + dated Bet 1 status
All checks were successful
fallow-py / fallow-py-advisory (pull_request) Successful in 16s
b7c0d85635
The supervised OpenClaw auto-heal GATE went live in production 2026-06-10 (Slice C,
iskra-openclaw#452 — hourly timer, e2e-verified, D20 boundaries held). The product
spine still described it as a 2027–2028 future. Reframe (operator-approved narrative
judgment), keeping the honest distinction: the GATE is live; the OSS-module EXTRACTION
(D4) remains future on the >5-PRs-without-false-blocker trigger.

- vision-narrative.md Turning Point 3: "Late 2028: auto-heal extracts" -> "gate arrives
  early (live 2026-06-10)"; full L4 extraction stays the 2028–2029 milestone.
- strategy.md Bet 2: bet statement + evidence backing flip L4 from assumption-pending to
  evidence-backed (gate); I7 notes the live gate as a concrete differentiator.
- strategy.md Bet 1: added dated status — still 0/5–7 interviews, D15 install-count
  precondition unmet, deadline 2026-09-30 (D22) — the most critical bet-invalidating gap.
- four-risks.md Feasibility: L4 gate de-risked early; Slice E + OSS extraction remain.

Docs-only; 303 tests green. From the 2026-06-16 docs-maturity wave (item #7).

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
pdurlej deleted branch claude/docs-product-spine-currency 2026-06-22 22:55:06 +02:00
Sign in to join this conversation.
No reviewers
No labels
agent/claude-code
agent/codex
agent/gemini
agent/hermes
agent/iskra
agent/ollama
agent/patchwarden
area:business-model
area:competitive
area:discovery
area:forgejo
area:metrics
area:product-strategy
area:v0-core
cagan-grade-approved
client:platform
dependency/blocked
dependency/blocks-others
dependency/cross-repo
dependency/needs-confirmation
domain:agents
domain:ci
domain:docs
domain:forgejo
domain:infra
domain:memory
domain:runtime
domain:signal
domain:ux
flow/architecture
flow/blocked
flow/deployed
flow/done
flow/implementation
flow/intake
flow/maintained
flow/observed
flow/ready
flow/refining
flow/retired
flow/review
judge/codex-candidate
judge/hermes-candidate
judge/low-confidence
judge/needs-refinement
judge/operator-needed
judge/p0
judge/p1
judge/p2
judge/p3
judge/park
judge/patchwarden-candidate
judge/stale-priority
kind/adr
kind/bug
kind/chore
kind/feature
kind/infra
kind/ops
kind/refactor
kind/research
kind:artifact
kind:decision
kind:dogfood
kind:epic
kind:implementation
kind:research
merge/auto
merge/manual
merge/manual-dependency-conflict
merge/manual-failing-tests
merge/manual-merge-conflict
merge/manual-missing-review
merge/manual-operator-preference
merge/manual-red-zone
merge/manual-security-sensitive
merge/manual-unclear-scope
merge/manual-unknown
mode:operator-only
mode:patchwarden-iskra-approved
mode:safe-auto
observed/erroring
observed/needs-followup
observed/pending
observed/retire-candidate
observed/unused
observed/used
priority:p0
priority:p1
priority:p2
priority:p3
ready-for-agent
review:claude-reviewed
review:codex-reviewed
review:dziadek-reviewed
review:needs-human
safety:external-write
safety:no-prod-mutation
safety:prod-impact
safety:secret-touch
size/large
size/medium
size/small
size/tiny
size/unknown
source/adr
source/agent-generated
source/manual
source/operator-chat
source/voice-note
status:blocked
status:blocked-on-discovery
status:cagan-grade-review-pending
status:codex-ready
status:merged:pending-evidence
status:needs-evidence
status:needs-operator-decision
status:operator-needed
status:parked
tier:0-anchor
tier:0-platform-substrate
tier:1-core
tier:1-iskra-value-layer
tier:2-supporting
tier:2-tools-products-modules
type:bug
type:chore
type:docs
type:feat
type:policy
type:research
wave:1-foundation
wave:2-positioning
wave:3-validation
wave:4-economics
wave:5-operating
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
pdurlej/patchwarden!96
No description provided.